& Challenge

During the critical shutdown and maintenance planning, our client identified a Vibration Cable as a crucial component that needed to be replaced. However, there was a significant hurdle – the cable was not in the client’s inventory and vendors were quoting a daunting 20-week lead time.

DIGATEX’s
Solution

Utilising the DIGATEX Inventory Hub, the client quickly discovered that the required cable was available in another operator’s inventory. Despite different cataloguing codes and descriptors, the Inventory Hub’s advanced matching capabilities facilitated instant identification. An automated email from the Inventory Hub connected the client with the other operator, leading to fast, fuss-free sourcing of the critical cable.

Implementation
& Outcome

Product Utilised: DIGATEX Inventory Hub

Major Benefits

Time Efficiency

Time Efficiency: The Inventory Hub’s rapid response allowed the shutdown to proceed without delay, avoiding a potential 20-week halt

Cost Savings

Cost Savings: By securing the necessary part in time, our client avoided significant production losses

Operational Continuity

Operational Continuity: Access to essential parts was uninterrupted, maintaining the project’s momentum

Conclusion

DIGATEX’s Inventory Hub proved instrumental in the successful outcome of a potentially costly and time-consuming challenge. This case study illustrates our commitment to providing innovative solutions that ensure operational efficiency and reliability in critical industry scenarios.